Frame Vertical Force Fatigue Testing Machine
CH-70-13
1 set
Shenzhen Sea Port of China
Quantity

SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Bicycle Testing Machine Product Introduction | ||||||||||
| Frame Vertical Force Fatigue Testing Machine | Model No.:CH-70-13 | |||||||||
Bicycle Testing Machine Description: | ||||||||||
1.Bicycle Testing Machine is used for imitating vertical force impact testing to Frame(including front fork).it's suitable for doing fatigue strength testing to frame of bicycle /ele-bicycle; | ||||||||||
2. Bicycle Testing Machine is efficient, stable and easy for adjusting and changing molds. | ||||||||||
3. Adopting motor to drive eccentric mechanism to imitate impact to front fork, Air cylinder to achieve the buffer to impact Counting system controls vibration times; The frequency and amplitude of vibration and distance of wheels can be adjustable. | ||||||||||
| Bicycle Testing Machine | Frame Vertical Force Fatigue Testing Machine | |||||||||
Function | Vibration Frame Testing | |||||||||
Application | Frame of bicyle/ele-bicycle | |||||||||
Distance between front&rear wheel | 620~1460 mmFrame Vertical Force Fatigue Frame Testing Machine | |||||||||
Vibration frequency | Max. 3 Hz | |||||||||
Vibration amplitude | 0~25 mm | |||||||||
Operation mode | Semi-auto | |||||||||
Power | 1.5 KW | |||||||||
Voltage | 2P 220V 50Hz | |||||||||
Control method | Relay | |||||||||
Start method | Press button | |||||||||
Air system pressure | 0.2~0.6 MPa | |||||||||
Color | Green | |||||||||
Size | 2100×800×1650 mm | |||||||||
Weight | 500 KG | |||||||||
Bicycle Testing Machine | Frame Vertical Force Fatigue Testing Machine |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
About Us






